AgroMachHubFarm machinery, irrigation, greenhouse, feed processing, and agricultural tools for global industrial buyers.
One Stage / Two Stage / Three Stage Temperature Controller for Exhaust Fan
Tractors And Implements

One Stage / Two Stage / Three Stage Temperature C | RFQ Sourcing Details

Tractors And Implements · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryBarn Ventilation Fans
Unitset
PowerRated
CategoryTractors And Implements
CategoryTractors And Implements
AvailabilityInquiry required
Source date2026-05-28

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Tractors And Implements. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Exhaust Fan Temperature / Time Controller One stage Time/Temperature Controller Power Rated Voltage Working Condition Temperature Control Time Control 3 phase 4 wires AC 380/220V±10% Temperature at0-60°, Relative humidity :RHxiaoyudengyu≤85%, non-corrosive air 0-50° Working time: 1s to 99h Off time:1 s to 99 h Feature: Simple operation, Time control-off- Temperature Control, free transansformation.

Control one group of fans on or off as per presetted data.

One-stage Temperature Controller Power Rated Voltage Working Condition Temperature Control 3phase 4 wires AC 380/220V±10% Temperature at0-60°, Relative humidity :RHxiaoyudengyu≤85%, non-corrosive air 0-50° Feature: Simple operation, Time control-off- Temperature Control, free transformation.

Control one group of fans on or off as per presetted data.

Two-stage Temperature Controller Power Rated Voltage Working Condition Temperature Control 3phase, 4 wires AC 380/220V ±10% Temperature at0-60°, Relative humidity :RHxiaoyudengyu≤85%, non-corrosive air 0-50° Feature: Control two groups of fans on or off as per temperature variation.

Effectively avoid current fluctuation when fans start on on the same time, meanwhile avoid temperature dropping.

Three-stage Temperature& One-stage Time Controller Power Rated Voltage Working Condition Temperature Control Time Control 3phase, 4wires AC 380/220V±10% Temperature at0-60°, Relative humidity :RHxiaoyudengyu≤85%, non-corrosive air 0-50° Working time: 1s-99h Off time: 1s-99h Feature: Simple operation ,all 4-stages have separate control button as Auto-off-Manual.

Stage-1,2,3 are temperature control, Stage-4 is time control. Stage-1,2,3 could set different temperature, when inner temperature below the minimum setting index, three groups of fans under stage-1,2,3 will not work,No.4 group will start on or stop by stage-4 time control.

When inner temperature increased, three groups of fans will running as per temperature setting. meanwhile No.4 group fans will stop.

Accura ndong Yuyun Sanhe Machinery Co.,Ltd is the biggest and the most professional manufacturer of ventilation equipment in China,equipped with the most advanced CNC production lines and laser cutting machines, top quality level in the industry.

One | Applications and Buyer Notes

One is organized as a sourcing-ready Tractors And Implements reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time quest

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Tractors And ImplementsBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Power
RatedBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryBarn Ventilation Fans
Unitset
PowerRated

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

AgroMachHub related sourcing paths

Related applications AgroMachHub related paths

Grain And Feed Processing

Related solutions AgroMachHub related paths

Farm Equipment Export Sourcing

Agro Processing Line Buying

AgroMachHub procurement phrases

AgroMachHub related product samples